Posted on Sep 21 2020 - 11:06am
After two years of struggling to find reliable contractors, I am pleased to announce that the front room of the TEP Sisson Mansion has been completely redone.
This includes:
- Refitting front entrance for a standard sized door
- Replacement of all treads and risers in the staircase
- Fixing of numerous blemishes in the staircase
- Leveling of all walls/ceiling from past "use" lol
- Painting of all walls/ceiling
The contractor also complete some other important work
- Casing issues on the kitchen door
- A new door for the back entrance
- Electronic locks for all three doors
- Fixed shingles that had come off near the Tent, to stop a leak.
Snaps to
- Dave Hadcock and the Property Committee
- Jim Corbett for always "getting it done" in Potsdam
- The Actives for dealing with this for two years.
Pictures can be found after logging in in the Photos section.